ASTRA 5B - Launch delayed by 24 hours
Meteorological conditions at the Spaceport in French Guiana on March 20, 2014 did not allow the authorization of Flight VA216’s launcher transfer from the Final Assembly Building to the launch zone.
The countdown of Flight VA216 has been delayed 24 hours, for a liftoff on Saturday, March 22 at 19h04 local time (22h04 UTC) during a launch window of 58 minutes.

Case study
CETel
German-based global satellite provider CETel, enabled by SES’ end-to-end managed connectivity solutions, has transformed mining operations in one of the most remote, land-locked sites in the world with access to cloud-based systems.
Read the full case study